Garage blockwork shell

Craigieburn

2025

A double garage shell in reinforced block, square enough that the roller door went in first try.

  • Scope

    Reinforced, core-filled block garage with a bond beam

  • Time on site

    3 weeks

  • Materials

    Grey block, steel to engineering

  • Type

    Residential

Garage blockwork shell
Garage blockwork shell
Garage blockwork shell

How it went.

The builder needed a garage shell fast, built exactly to the engineer’s drawings.

The fix

Reinforced, core-filled blockwork with a bond beam, inspections booked in ahead and openings checked against the door schedule.

The result

Square, plumb and handed over on time for the roofers.

“Neat blockwork, good communication with our engineer, and a tidy site for the next trade.”

Builder, residential shell

Core-filled walls

Core-filled walls

Clean block faces ready for render

Clean block faces ready for render

Got a wall in mind?

Free, itemised quotes within two working days. No obligation and no hard sell.

Got a wall in mind?

Free, itemised quotes within two working days. No obligation and no hard sell.

Got a wall in mind?

Free, itemised quotes within two working days. No obligation and no hard sell.

Create a free website with Framer, the website builder loved by startups, designers and agencies.