What’s included.
Site measure and written quote
Set-out, string lines and gauge rods
Damp course, wall ties and lintels
Pointing, wash-down and site tidy
How it runs.
Measure
We walk the site, check footings and access, and price from the plans.
Set out
Corners, gauge and string lines go up before a single brick is laid.
Lay
Course by course, tied and plumb, with the crew you met at quote time.
Point and clean
Joints struck to your choice of finish, the face washed down, the site cleared.
What good looks like.
Good bricklaying is mostly invisible. Courses run level, perpends line up, and the wall looks like it has always been there. That comes from the set-out, not the last day of the job.
What we lay
Full houses and extensions, garden and boundary walls, piers, steps and planters. Face brick, rendered brick, recycled brick and double-brick construction.
How we price it
Per square metre for most walls, with access, height and brick choice factored in. Your quote shows the rate, the quantity and anything that sits outside the price.



Two-storey brick extension
Bricklaying
·
Yarraville
A two-storey rear extension in blended red brick, matched so closely it looks like it was always there.
Scope
Double-brick rear extension over two storeys, about 11,400 bricks
Time on site
7 weeks
Materials
Blended red face brick, off-white mortar


