Retaining Walls

Retaining walls fail from water, not weight. Ours get a proper footing and drainage, so the garden stays put.

Retaining Walls by our crew
Retaining Walls by our crew
Retaining Walls by our crew

Guide price

From $420 per lineal metre

Typical time

Most walls take 1 to 4 weeks

Ideal for

Sloping blocks, terraced gardens, driveways and boundaries

What’s included.

  • Engineering for walls over 1 metre

  • Excavation and compacted footing

  • Ag drain, gravel backfill and weep holes

  • Capping, backfill and garden-ready finish

How it runs.

  1. Assess

    Height, soil, drainage and access, with engineering when the wall needs it.

  2. Dig and footing

    A level, compacted footing sized for the load behind it.

  3. Build and drain

    Wall up, ag drain and gravel behind it, weep holes through it.

  4. Cap and backfill

    Caps on, soil back, and a tidy bed ready for planting.

What good looks like.

A retaining wall is holding back tonnes of wet soil. The brick or block you see matters less than the footing and drainage you don’t.

Materials

Split-face and smooth block, face brick, sandstone and recycled stone. We will tell you which suits the height and the house.

Approvals

Walls over a certain height usually need engineering and sometimes approval. We will tell you before we quote, not after.

Squared sandstone retaining wall under a hedge
Concrete block retaining wall beside a flowering oleander
Drystone retaining wall along a woodland path with a timber gate

Do I need an engineer?

For most walls over 1 metre, or near a boundary or building, yes. We can arrange one.

Which material lasts longest?

All three last decades when drained properly. Block is the most economical; brick and stone suit the house.

Terraced garden walls

Terraced garden walls

Retaining Walls

·

Eltham

A steep back yard turned into three level beds, with a path you can push a mower along.

  • Scope

    Three tiers of block retaining, 38 lineal metres, with drainage and capping

  • Time on site

    4 weeks

  • Materials

    Split-face block, sandstone caps

Got a wall in mind?

Free, itemised quotes within two working days. No obligation and no hard sell.

Got a wall in mind?

Free, itemised quotes within two working days. No obligation and no hard sell.

Got a wall in mind?

Free, itemised quotes within two working days. No obligation and no hard sell.

Create a free website with Framer, the website builder loved by startups, designers and agencies.